I've got you next update on Fury325 here.  Now that the track is finished they seem to be moving right along in finishing everything else.  I've got two pictures for yinz this evening to enjoy.

Pulled from Facebook
This is a photograph of the hill from the operator booth or what will be the booth, lol. It's such an awesome hill and I can't wait to ride this beauty!!

Pulled from Facebook
Here are the queue lines on the ride platform. The hive design is really cool and I can only hope that the rest of the platform will be just as neat. I say go with a whole hive thing: turn the platform into a hive all around!

Pulled from Twitter
This is a picture of the tunnel design that runs underground on the coaster. You can see the track is all wrapped up while they're working on the tunnel frame. The worker also adds perspective so yinz can see how big the tunnel actually is.